Our Projects

Fukushima Higashitanagura Solar Farm
Power Offtake: Tohoku Electric Power Transmission & Distribution Co., Inc.
System Capacity: 82.0 kWp / 49.5 kWac
Location: Higashishirakawa District, Fukushima Prefecture
EPC Contractor: Solnergy Co., Ltd.
Commercial Operation Date: July 1, 2020

Tochigi Sakura Solar Farm
Power Offtake: TEPCO Power Grid, Inc.
System Capacity: 82.0 kWp / 49.5 kWac
Location: Sakura City, Tochigi Prefecture
EPC Contractor: Solnergy Co., Ltd.
Commercial Operation Date: December 25, 2020

Tochigi Sakura No.4 Solar Farm
Power Offtake: Chiba Electric Co.,Ltd.
System Capacity: 80.0 kWp / 49.5 kWac
Location: Sakura City, Tochigi Prefecture
EPC Contractor: Solnergy Co., Ltd.
Commercial Operation Date: March 30, 2024

Tochigi Sakura No.7 Solar Farm
Power Offtake: Chiba Electric Co.,Ltd.
System Capacity: 80.0 kWp / 49.5 kWac
Location: Sakura City, Tochigi Prefecture
EPC Contractor: Solnergy Co., Ltd.
Commercial Operation Date: February 15, 2024