Our Projects

Fukushima Higashitanagura Solar Farm 

Power Offtake: Tohoku Electric Power Transmission & Distribution Co., Inc.

System Capacity: 82.0 kWp / 49.5 kWac

Location: Higashishirakawa District, Fukushima Prefecture

EPC Contractor: Solnergy Co., Ltd.

Commercial Operation Date: July 1, 2020

Tochigi Sakura Solar Farm

Power Offtake: TEPCO Power Grid, Inc.

System Capacity: 82.0 kWp / 49.5 kWac

Location: Sakura City, Tochigi Prefecture

EPC Contractor: Solnergy Co., Ltd.

Commercial Operation Date: December 25, 2020

Tochigi Sakura No.4 Solar Farm

Power Offtake: Chiba Electric Co.,Ltd.

System Capacity: 80.0 kWp / 49.5 kWac

Location: Sakura City, Tochigi Prefecture

EPC Contractor: Solnergy Co., Ltd.

Commercial Operation Date: March 30, 2024

Tochigi Sakura No.7 Solar Farm

Power Offtake: Chiba Electric Co.,Ltd.

System Capacity: 80.0 kWp / 49.5 kWac

Location: Sakura City, Tochigi Prefecture

EPC Contractor: Solnergy Co., Ltd.

Commercial Operation Date: February 15, 2024